Environmental Due Diligence of a Oil & Gas portfolio in Kenya, Uganda, Tanzania

Environmental Due Diligence of a Oil & Gas portfolio in Kenya, Uganda, Tanzania

Environmental liability assessment of 118 oil & gas facilities spread over three countries within a short timeframe

A major Oil & Gas Company wished to acquire a large portfolio of facilities in East Africa including:

  • Terminals (3) and Depots (2);
  • Service Stations (106) and Passive Depots (7).

The transaction process includes the completion of an Environmental Due Diligence (EDD) aiming at:

  • Getting the Environmental baseline of all GAPCO sites in Kenya, Uganda & Tanzania (Phase 1 – Preliminary studies);
  • Based on the baseline results, identifying potential environmental risks and conducting complementary investigations to highlight potential health risks and delineate required remediation measures (Phase 2 – Detailed investigations).

Challenge

More than 35 experienced staff from Antea Group were involved in the project in order to:

  • Respect the limited timeframe (12 months) to complete the project
  • Ensure high EHS and QA/QC management and provide homogeneous & high-quality deliverables

To support field data acquisition and interpretation, software was developed by Antea Group in order to:

  • Collect EHS related data on a daily basis
  • Collect and cross-check field and laboratory data
  • Automatically edit relevant tables, graphs and cartography

Solution

The Environmental Due Diligence was completed by providing the following services:

  • Desktop review & environmental site visit;
  • Site investigations including soil gas sampling, soil sampling, monitoring well implementation and groundwater sampling;
  • Laboratory analysis;
  • Preparation of the Preliminary Environmental report including a Conceptual Site Model (CSM) and preparation of the Detailed Environmental Report including a Risk Based Corrective Action (RBCA) Assessment and a Remediation Options Appraisal (ROA) and Remediation Scheme;
  • Preparation and implementation of all relevant project management documents (EHS, QA/QC management plan).

Key Figures

  • 2,000 survey points
  • 4,300 m drilled
  • 200,000 km travelled by car
  • 230 reports written

This website uses cookies

Functional and analytical cookies are placed with every visit without requiring permission. Use of the Social Media buttons depends on the privacy statement and cookie policy of the relevant social network. Targeting cookies from third parties are only placed if you give your consent. Select the type of cookies you want to accept.